User contributions
From Engineering Policy Guide
(Latest | Earliest) View (newer 50) (older 50) (20 | 50 | 100 | 250 | 500)
- 14:23, 20 May 2013 (hist) (diff) N Image:Main Page May 20, 2013.jpg (top)
- 14:22, 20 May 2013 (hist) (diff) m Main Page (new photo) (top)
- 14:10, 20 May 2013 (hist) (diff) m 643.3 Policy, Standards and Regulations (→643.3.14 Utility Permit Procedures) (top)
- 14:10, 20 May 2013 (hist) (diff) N Image:643.3.15.jpg (top)
- 14:09, 20 May 2013 (hist) (diff) m 643.3 Policy, Standards and Regulations (new photo)
- 12:26, 20 May 2013 (hist) (diff) m Main Page
- 11:58, 17 May 2013 (hist) (diff) N Image:Main Page May 17, 2013.jpg (top)
- 11:58, 17 May 2013 (hist) (diff) m Main Page (new photo)
- 11:27, 17 May 2013 (hist) (diff) N Image:134.2.2.2 May 2013.doc (top)
- 11:26, 17 May 2013 (hist) (diff) m Category:134 Engineering Professional Services (Per Design, two spelling corrections in Fig. 134.2.2.2) (top)
- 08:54, 17 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (top)
- 08:34, 17 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (Figs. 136.9.1 and 136.9.3.)
- 08:32, 17 May 2013 (hist) (diff) m 136.12 Figures and Glossary (Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.) (top)
- 08:31, 17 May 2013 (hist) (diff) N Image:136.9.3 May 17, 2013.doc (top)
- 08:30, 17 May 2013 (hist) (diff) N Image:136.9.1 May 17, 2013.xlsx (top)
- 08:30, 17 May 2013 (hist) (diff) m 136.9 Plans, Specs and Estimates (PSE) (Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.) (top)
- 15:58, 16 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (EPG 136.4.2.7.5)
- 15:55, 16 May 2013 (hist) (diff) m 136.4 Consultant Selection and Consultant Contract Management (→136.4.2.7.4 Ceasing Negotiation: Per LPA, new guidance about contract execution timeframe) (top)
- 15:49, 16 May 2013 (hist) (diff) m Main Page (EPG 751.6.2)
- 15:39, 16 May 2013 (hist) (diff) m 751.50 Standard Detailing Notes (Per Bridge, amended Standard detailing Notes for editorial corrections.) (top)
- 15:27, 16 May 2013 (hist) (diff) m 751.6 General Quantities (→751.6.2 Computation of Estimated Quantities: Per Bridge, amended Non-Destructive Testing to specifically require only welds of terminal sections of cover plates in tension areas to be checked.) (top)
- 15:24, 16 May 2013 (hist) (diff) m 751.6 General Quantities (→751.6.2 Computation of Estimated Quantities: Per Bridge, guidance for computing slab quantity for bridge plans added)
- 15:12, 16 May 2013 (hist) (diff) m Main Page
- 15:04, 16 May 2013 (hist) (diff) N Image:Main Page 3 May 16, 2013.jpg (top)
- 15:04, 16 May 2013 (hist) (diff) m Main Page (EPG 751.2)
- 14:44, 16 May 2013 (hist) (diff) m 751.2 Loads (→751.2.4 Load Distributions: Per Bridge, revised the definition of "ts" to mean full depth of concrete slab) (top)
- 12:29, 16 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (EPG 136.4.2.6)
- 12:26, 16 May 2013 (hist) (diff) m 136.4 Consultant Selection and Consultant Contract Management (→136.4.2.6 Step 5 - Selection of Consultant: Per LPA, additional guidance for selecting and scoring a consultant)
- 12:19, 16 May 2013 (hist) (diff) N Image:236 Form 3.4.2 2013.docx (top)
- 12:18, 16 May 2013 (hist) (diff) m 236.3 Administration (Per RW, minor update to Form 3.4.2. CE, EA and EIS boxes added) (top)
- 11:40, 16 May 2013 (hist) (diff) m Category:616 Temporary Traffic Control (Per Traffic, removed archaic "Work Zone Fine signing sequence" figure. The current figure is still available at EPG 616.12.3.4.) (top)
- 08:24, 16 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist)
- 08:23, 16 May 2013 (hist) (diff) m 136.12 Figures and Glossary (Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist)
- 08:22, 16 May 2013 (hist) (diff) m 136.11 Local Public Agency Construction (Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist) (top)
- 16:27, 15 May 2013 (hist) (diff) m Main Page
- 16:25, 15 May 2013 (hist) (diff) m Main Page
- 12:12, 15 May 2013 (hist) (diff) m Main Page
- 12:12, 15 May 2013 (hist) (diff) m Main Page
- 11:56, 15 May 2013 (hist) (diff) m Main Page
- 11:55, 15 May 2013 (hist) (diff) N Image:Main Page 4 May 15, 2013.jpg (top)
- 11:55, 15 May 2013 (hist) (diff) N Image:Main Page 3 May 15, 2013.jpg (top)
- 11:55, 15 May 2013 (hist) (diff) N Image:Main Page 2 May 15, 2013.jpg (top)
- 11:54, 15 May 2013 (hist) (diff) N Image:Main Page May 15, 2013.jpg (top)
- 11:54, 15 May 2013 (hist) (diff) m Main Page (EPG 134)
- 10:57, 15 May 2013 (hist) (diff) m Category:134 Engineering Professional Services (→134.1.7 Workforce Diversity: Per Design, minor clarification of the workforce diversity guidance)
- 10:52, 15 May 2013 (hist) (diff) m Category:134 Engineering Professional Services (Per Design, clarification of EPG 134.5.1.1)
- 10:26, 15 May 2013 (hist) (diff) m 136.13 LPA Policy Changes (Fig. 136.4.8)
- 10:24, 15 May 2013 (hist) (diff) m 136.12 Figures and Glossary (Per LPA, removed Fig 136.4.8 since this form is no longer required.)
- 10:23, 15 May 2013 (hist) (diff) m 136.4 Consultant Selection and Consultant Contract Management (Per LPA, removed Fig 136.4.8 since this form is no longer required.)
- 14:30, 14 May 2013 (hist) (diff) N Image:134.5.1.1 2013.xlsx (top)
(Latest | Earliest) View (newer 50) (older 50) (20 | 50 | 100 | 250 | 500)